The following tools from multiple regression analysis carry over in a meaningful manner to the linear probability model, with the exception of the
选项:
A: F-statistic.
B: significance test using the t-statistic.
C: 95% confidence interval using ± 1.96 times the standard error.
D: regression R2.
发布时间:2024-06-11 22:04:59